@DustyHouse wrote:
Hi All,
So I’ve done my Hello World and it looks like everything is working nicely.
I have a question about wasteboard levelling. I see two variations of T-Track setup. One has ~23" tracks and MDF extending the full width and depth of the table. The second appears to only have MDF in the actual working area of the tool head.
If I plan to level the wasteboard, I am presuming that the only option is to use the reduced size. Otherwise any piece that is larger than the levelled area will defeat the benefits of a levelled wasteboard?
Thoughts appreciated.
Ben
Posts: 2
Participants: 2